logo
Latest company case about

Solutions Details

Created with Pixso. Home Created with Pixso. solutions Created with Pixso.

Packing Copper Pipes in Wooden Crates & Container Loading Process

Packing Copper Pipes in Wooden Crates & Container Loading Process

2025-07-22

Client: A European HVAC manufacturer purchasing 2,000 pcs of 6-meter copper pipes (OD 22mm, 1mm thickness) for refrigeration systems.

Objective: Safely pack and ship the copper pipes to prevent damage during transit while optimizing container space.


Step-by-Step Packing & Shipping Process

1. Pre-Packing Preparation

  • Material Check: Verify pipe dimensions, surface quality (no scratches/dents), and quantity (2,000 pcs).

  • Packing Materials:

    • Wooden crates (120cm × 60cm × 60cm, fumigation-treated, ISPM 15 compliant)

    • Anti-corrosion VCI paper (wrapped around pipes)

    • Foam end caps (to protect pipe edges)

    • Steel strapping (for crate reinforcement)

    • Waterproof plastic sheeting (for moisture protection)

2. Packing Process

  1. Pipe Bundling:

    • Group 20 pipes per bundle, secured with plastic straps.

    • Wrap each bundle with VCI paper to prevent oxidation.

    • Add foam end caps to both ends.

  2. Wooden Crate Assembly:

    • Base: Lay a plastic sheet inside the crate for moisture resistance.

    • Loading: Place 5 bundles (100 pipes) per crate, separated by foam spacers.

    • Top Cover: Seal with another plastic sheet before nailing the wooden lid.

    • Reinforcement: Secure crates with steel strapping for heavy-duty transport.

  3. Labeling:

    • Mark each crate with:

      • "FRAGILE – HANDLE WITH CARE"

      • Gross Weight (e.g., 250 kg)

      • Customer PO & Item No.

3. Container Loading (40ft HQ Container)

  • Max Capacity: 20 crates (2,000 pipes total).

  • Loading Steps:

    1. Floor Protection: Lay corrugated cardboard sheets to prevent slipping.

    2. Stacking: Place crates in 2 layers (10 crates per layer) with forklift.

    3. Securing: Use container lock rods & airbags to prevent movement.

    4. Moisture Control: Add desiccant bags (5 units) inside the container.

4. Documentation & Shipping

  • Packing List (itemizing crate contents)

  • Bill of Lading (with HS Code: 7411.2100 for copper pipes)

  • Fumigation Certificate (for wooden packaging)

  • Third-Party Inspection Report (optional, per client request)

Shipping Details:

  • Port of Loading: Shanghai

  • Destination: Hamburg

  • Transit Time: 28 days

  • Insurance: All-risk coverage (0.3% of cargo value)


Key Takeaways for the Client

✅ Damage Prevention: Wooden crates + foam protection ensure safe transit.
✅ Efficient Space Use: Optimized loading fits 2,000 pipes in one 40ft HQ container.
✅ Compliance: ISPM 15, IMO, and EU customs standards met.

Client Feedback:
"The packing method eliminated pipe deformation issues we faced with previous suppliers. The detailed loading photos helped verify quality before shipment."