Packing Copper Pipes in Wooden Crates & Container Loading Process
Client: A European HVAC manufacturer purchasing 2,000 pcs of 6-meter copper pipes (OD 22mm, 1mm thickness) for refrigeration systems.
Objective: Safely pack and ship the copper pipes to prevent damage during transit while optimizing container space.
Step-by-Step Packing & Shipping Process
1. Pre-Packing Preparation
-
Material Check: Verify pipe dimensions, surface quality (no scratches/dents), and quantity (2,000 pcs).
-
Packing Materials:
-
Wooden crates (120cm × 60cm × 60cm, fumigation-treated, ISPM 15 compliant)
-
Anti-corrosion VCI paper (wrapped around pipes)
-
Foam end caps (to protect pipe edges)
-
Steel strapping (for crate reinforcement)
-
Waterproof plastic sheeting (for moisture protection)
-
2. Packing Process
-
Pipe Bundling:
-
Group 20 pipes per bundle, secured with plastic straps.
-
Wrap each bundle with VCI paper to prevent oxidation.
-
Add foam end caps to both ends.
-
-
Wooden Crate Assembly:
-
Base: Lay a plastic sheet inside the crate for moisture resistance.
-
Loading: Place 5 bundles (100 pipes) per crate, separated by foam spacers.
-
Top Cover: Seal with another plastic sheet before nailing the wooden lid.
-
Reinforcement: Secure crates with steel strapping for heavy-duty transport.
-
-
Labeling:
-
Mark each crate with:
-
"FRAGILE – HANDLE WITH CARE"
-
Gross Weight (e.g., 250 kg)
-
Customer PO & Item No.
-
-
3. Container Loading (40ft HQ Container)
-
Max Capacity: 20 crates (2,000 pipes total).
-
Loading Steps:
-
Floor Protection: Lay corrugated cardboard sheets to prevent slipping.
-
Stacking: Place crates in 2 layers (10 crates per layer) with forklift.
-
Securing: Use container lock rods & airbags to prevent movement.
-
Moisture Control: Add desiccant bags (5 units) inside the container.
-
4. Documentation & Shipping
-
Packing List (itemizing crate contents)
-
Bill of Lading (with HS Code: 7411.2100 for copper pipes)
-
Fumigation Certificate (for wooden packaging)
-
Third-Party Inspection Report (optional, per client request)
Shipping Details:
-
Port of Loading: Shanghai
-
Destination: Hamburg
-
Transit Time: 28 days
-
Insurance: All-risk coverage (0.3% of cargo value)
Key Takeaways for the Client
✅ Damage Prevention: Wooden crates + foam protection ensure safe transit.
✅ Efficient Space Use: Optimized loading fits 2,000 pipes in one 40ft HQ container.
✅ Compliance: ISPM 15, IMO, and EU customs standards met.
Client Feedback:
"The packing method eliminated pipe deformation issues we faced with previous suppliers. The detailed loading photos helped verify quality before shipment."